cancel
Showing results for 
Search instead for 
Did you mean: 
Reply
Kornfour
Paper Tape
Posts: 12
Registered: ‎11-25-2012
Location: St.Louis,MO
Views: 1,067
Message 41 of 116

Re: Yoga 13 model availability and options

Water under the bridge, I switched my order to the orange i7 256gb. My ship date now is 12/12/2012. The only difference other than color, is the silver has windows 8 pro vs orange with just windows 8.
ecofunkological
Punch Card
Posts: 10
Registered: ‎11-20-2012
Location: Oregon
Views: 1,053
Message 42 of 116

Re: Yoga 13 model availability and options

Same here. I cancelled my previous order and ordered the Clementine.  My estimated ship date is 12/11.

vvdd
Punch Card
Posts: 20
Registered: ‎12-07-2012
Location: USA
Views: 755
Message 43 of 116

Re: Yoga 13 model availability and options

My estimated ship date went from Dec 10, to Dec 17, now Dec 27..... I wonder what these delays are about. It is frustrating to see the ship date being pushed back constantly. I really hope these delays are a result of Lenovo taking time to fixing some of the issues that the other Yoga owners are experiencing.

youngdoc
Paper Tape
Posts: 1
Registered: ‎12-12-2012
Location: United States
Views: 670
Message 44 of 116

Shipping date/notification?

Hi all, 

 

On Lenovo's order status page (http://ovp.lenovo.com/lenovo-ovp/public/showDetail!publicStatusIndex.action), I'm seeing that the estimated ship date for my Yoga 13 is today, 12/12/2012.  However, I have not yet received any confirmation of shipping or tracking and the status page continues to read "estimated ship date." 

 

My estimated ship date was originally further out, but Lenovo updated it to 12/12/12 about 10 days ago and they charged my credit card at the same time, so I assume that the date has a reasonable chance of being accurate. 

 

In your experience, did your device ship on the ship date listed and (perhaps the better question) when it did, did you receive shipping and/or tracking notification the same day?  And is there a better way to determine the shipping status?  I'm just trying to figure out if my Yoga did indeed get on its way to me today. 

 

Thanks!

ecofunkological
Punch Card
Posts: 10
Registered: ‎11-20-2012
Location: Oregon
Views: 750
Message 45 of 116

Re: Yoga 13 model availability and options

My order says "released to manufacturing" with an estimated ship date of 12/11/12. So, my ship date hasn't changed but it already passed.

spense6478
Paper Tape
Posts: 2
Registered: ‎12-12-2012
Location: Wisconsin
Views: 704
Message 46 of 116

Re: Yoga 13 model availability and options

I ordered a clementine on the 8th. Expected ship went immediately from the 23rd to the 30th until today when it went into production and now my expected ship date is tomorrow!
vvdd
Punch Card
Posts: 20
Registered: ‎12-07-2012
Location: USA
Views: 682
Message 47 of 116

Re: Yoga 13 model availability and options


@spense6478 wrote:
I ordered a clementine on the 8th. Expected ship went immediately from the 23rd to the 30th until today when it went into production and now my expected ship date is tomorrow!

That's awesome. I ordered mine on the 5th...

 

Out of curiousity, which configuration did you order?

 

Mine is the orange with i7 and 256gb ssd.

dumbth
SCSI Port
Posts: 119
Registered: ‎12-07-2012
Location: hawaii
Views: 655
Message 48 of 116

Re: Yoga 13 model availability and options

My i7 gb256 clementino just shipped, ahead of 12/23 estimate! Ordered 12/6 and due 12/17. Happy holidays are on the horizon.

For my sins of big spending, i have promised myself to not upgrade my 1gb sd card for many months! Good timing though, because both of my 10 inch tablets are dying on me.
vvdd
Punch Card
Posts: 20
Registered: ‎12-07-2012
Location: USA
Views: 646
Message 49 of 116

Re: Yoga 13 model availability and options

yes! i just got a tracking number for mine as well. hope the machine runs smoothly and glitch free Smiley Wink

BCA2812
Punch Card
Posts: 3
Registered: ‎11-22-2012
Location: Louisville, Kentucky
Views: 625
Message 50 of 116

Re: Shipping date/notification?

Based on my recent experience.... If the STATUS on your order page moves from ORDER RECEIVED to RELEASED TO MANUFACTURING, then shipment is in a day or two.  Early morning yesterday, my status changed and when I checked this morning, it has shipped with UPS tracking number coming from China.  Original ship date estimate was 12-11.  Hope this helps.

Check out current deals!


Shop current deals

Top Kudoed Authors